Featured Projects


Ikea
Electric Vehicle Charging Stations
IKEA, the world's leading home furniture retailer, understands that their focus on sustainable transport empowers their customers to live sustainably.
IKEA partnered with ABS and ECOtality to install Blink® EV charging stations at two of their California locations.

9th and Figueroa
Los Angeles
New Building
Construction
ABS performed the electrical portion of the 31-story Concerto Project in LA's South Park District.
ABS's lighting designs and value engineering of the electrical saved the building owner more than $700,000.
CVS Health
Lighting Upgrades
CVS is a pharmacy innovation company. Their 'Planet in Balance' program ensures that environmental sustainability is embedded in their approach to business operations and product development.
CVS partnered with ABS to upgrade interior and exterior lighting in more than 150 locations throughout California. The upgrades reduced energy consumption, overhead costs and greenhouse gas emissions.

Orange Coast College
Electric Vehicle Charging
Station
With gas prices continuing to reach record highs and transportation being a major source of carbon emissions, Orange Coast College is committed to finding new ways to make having an electric car more easy convenient for students and faculty. The college partnered with ABS to install EV charging stations.


Oakland International Airport
General Construction
ABS was the general contractor on the remodel of the airport's rental can building. Remodeling the front counter and back of house areas at Hertz, Avis, Budget, Enterprise, Thrifty, Dollar. The project consisted of demolition of existing infrastructure, drywall, electrical, new millwork, signage, lighting, and flooring

Grauman's Chinese Theatre
Electrical Infrastructure Replacement
Grauman's Chinese Theatre partnered with ABS to help upgrade the theatre's aging electric infrastructure (the theatre was built in 1931). ABS rewired every wire in the theatre. To avoid shutting down the theatre during the day, ABS did all work at night—leaving the theatre in pristine, working condition every morning. Even though the project extended over 18 months, no one visiting the theatre was ever aware renovations were ongoing.